New Houses — revision 02
22 EASTVILLE AVE, TorontoPermit details
- Application
- 24 201222 BLD rev 02
- Address
- 22 EASTVILLE AVE, Toronto (M1M)
full property record — every permit and signal at this address
- Work
- New Building
- Structure
- 2 Unit - Detached
- Status
- Not Started
- Applied
- 2026-08-10
- Issued
- —
- Declared value
- —
- Current use
- Sfd
- Proposed use
- Sfd
- Builder
- Owner-filed
Scope of work (as filed)
Revison 02: 1. Roof plan/ 3rd floor: GFA increased; total building height remain unchanged and required front & rear setback maintained. 2. Basement: prayer room, elevator & heated closet proposed. 3. Ground floor: powder room converted to full washroom, kitchen door & wall alteration, elevator added, window added/revised, stair orientation revised. 4. 2nd floor: closet, kitchenette and laundry location alteration. Proposed construction of new SFD with finished basement
Inferred opportunity scopes
Residential alterationsDerived by rules from the permit text — an opportunity signal, not a statement that these packages are open or being bid.
Same application (5)
| Permit | Applied | Status |
|---|---|---|
| New Houses rev 00 New Building |
2024-08-20 | Inspection |
| Plumbing(PS) rev 00 Building Permit Related(PS) |
2024-08-20 | Inspection |
| Drain and Site Service rev 00 Building Permit Related (DR) |
2024-08-20 | Inspection |
| New Houses rev 01 New Building |
2026-05-08 | Revision Issued |
| Mechanical(MS) rev 00 Building Permit Related(MS) |
2026-06-04 | Permit Issued |
Revisions and plumbing/mechanical/drain permits filed under the same application number.