Market activity
Rendered live from the event stream that also powers the email digestEvery entry is a detected change in the market — new permits, tender openings, status changes, competitor registrations.
Monday, August 17
SIGNAL CONFIRMED
Site plan approval — The proposed development has a height of 9-storeys above-grade (41.4 metres to the top of the main building) with additional rooftop mechani
18:24
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval to permit the demolition, renovation and reconfiguration of the existing Toronto Lawn Tennis Club clubhouse and the semi-
18:24
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium for a residential tower atop 3 levels of below grade parking containing 209 units and 151 parking spaces.
18:24
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium for a residential tower atop 3 levels of below grade parking containing 687 units and 499 parking spaces.
18:24
SIGNAL CONFIRMED
Part lot control — Part Lot Control Exemption to create shared property boundaries for commercial parking facilities, retail spaces, and office components of t
18:24
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium for a residential tower atop 3 levels of below grade parking containing 377 units and 258 parking spaces.
18:24
SIGNAL CONFIRMED
Site plan approval — Site Plan Control proposing a three storey new health and wellness centre including recreation, fitness and multi-purpose facilities for Sen
18:24
SIGNAL CONFIRMED
Plan of condominium — Draft plan of condominium for the non-residential portions (retail, office, and associated non-residential parking) of the Proposed Developm
18:24
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed amendments to the site-specific zoning by-law for the Bloor-Kipling lands to permit a modified version of the approved mixed use bu
18:24
SIGNAL CONFIRMED
Site plan approval — Site Plan Administrative Amendment to 22 129524 STE 09 SA.
18:24
SIGNAL CONFIRMED
Site plan approval — Site Plan Administrative Amendment to 22 129491 STE 09 SA.
18:24
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed two connected bar buildings of five and six storeys are proposed, each containing a tower element of 53 and 47 storeys respectively
18:24
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval for the relocation of Toronto Fire and Emergency Service Station 332 to the south side of Metro Hall.
18:24
SIGNAL CONFIRMED
Site plan approval — A 20-storey privately-owned student residence building containing 17,649 square metres of residential gross floor area and 60 square metres
18:24
SIGNAL CONFIRMED
Site plan approval — Proposed 43-storey tower and a 28-storey tower. The Subject Site will include 839 purpose-built rental apartments comprised of 198 affordabl
18:24
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed increase in height from the previously approved 29-storey tower to a 37-storey tower. The proposal increases the GFA by 3591 square
18:24
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — The requested Amendments seek to modify the approved tower heights for the developments on Blocks 4, 6C, and 7, and revise the built form ty
18:24
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium to permit 5 units in a three-storey building (fourplex) and two-storey ancillary building contaning a garden suite
18:24
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium Application to create 80 new units.
18:24
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Through the Ontario-Toronto New Deal Agreement, the City and the Province agreed to advance a Transit Oriented Community at the future Woodb
18:24
SIGNAL CONFIRMED
Site plan approval — Proposed 49 storey mixed-use, 544-unit residential tower containing 46,009sqm residential GFA and 920sqm non-residential GFA, with a total h
18:23
SIGNAL CONFIRMED
Site plan approval — Proposed 18-storey mixed-use purpose-built rental building with 364 sqm of non-residental GFA, and 176 units including 6 affordable rental
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application for Block 6c proposes the development of an 39-storey residential tower including a 6 storey podium. The build
18:23
SIGNAL CONFIRMED
Site plan approval — The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground floor non-residential GFA. Of the 268 units, over 50%
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval application for a portion of the lands known municipally as 2A Flemington Road bounded by Turtle Island Road to the nort
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — OPA & Rezoning Application proposes the development of an 38-storey mixed-use building providing rental residential and retail use at grade.
18:23
SIGNAL CONFIRMED
Site plan approval — The proposed development is Phase 1, Housing Now Program, and is comprised of two residential towers (Building A & B) atop a single podium.
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Amendment. seeking to amend a previous Site Plan Approval to reflect the existing conditions of Parkway Mall. The changes uncludes
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — This OPA Application is related to the Applicant's existing application for a Zoning By-Law Amendment, currently under review by the City, w
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application proposes the development of a 48-storey mixed-use building providing residential and commercial use at grade.
18:23
SIGNAL CONFIRMED
Site plan approval — Construction of a new 10 Storey Mixed-Use Commercial/Residential building with 6979.51 m2 of Residential GFA and 72 residential units.
18:23
SIGNAL CONFIRMED
Site plan approval — Site plan control application proposing a 1-storey wood panel manufacturing building.
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed a 6-storey L-shaped residential building plus a rooftop mechanical penthouse on the rear portion of the lands, while maintaining th
18:23
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Phased Condominium for 958 residential dwelling units.
18:23
SIGNAL CONFIRMED
Site plan approval — Phase 2 for the development of a Logistics Hub. Phase 2 involves a 23397.52m2 one storey industrial warehouse building with five accessory o
18:23
SIGNAL CONFIRMED
Site plan approval — Proposal of adding another warehouse of 2922.4 sqm attached to the existing warehouse building.
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval for a 6-storey mass timber residential building for 19 affordable dwelling units.
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Combined Official Plan & Zoning By-law Amendment for a 2 tower mixed-use building (45 and 49 storeys) atop the historic Dominion Public Buil
18:23
SIGNAL CONFIRMED
Site plan approval — Proposed three-storey elementary school for 823 students, including a daycare facility for 88 children.
18:23
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium for a 31-storey building, in relation to Site Plan 20 181703 STE 09 SA.
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Control application for Block 3A of 1245 Dupont Street that includes the construction of a 50 storey (156.95 metres) market rental
18:23
SIGNAL CONFIRMED
Site plan approval — To construct a 4-storey 12-unit rental apartment building at rear of an existing apartment building.
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Application for the demolition of the existing building and redevelopment of a new long-term care home building, consisting of an
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Zoning By-law Amendment - Lifting of the H Symbol for 23 167778 STE 10 OZ and 25 231179 STE 10 OZ
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval for a 15-storey building at 604-610 Bay Street and a 43-storey building at 130 Elizabeth Street. The proposed development
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application for a 35-storey (112.6) metre building (excluding mechanical penthouse) 25,069 square metres of residential gr
18:23
SIGNAL CONFIRMED
Site plan approval — Site plan application for Quayside Building 2, a 56 storey, 618 unit building to be delivered as part of the Quayside project. The proposed
18:23
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Standard Condominium to create 339 residential units and 1 retail unit within a 34-storey building.
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval for a 10 storey residential building with 74 dwelling units, 23 of which will be affordable housing and a one-storey anci
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed standalone Official Plan Amendment (OPA) application which seeks to only redesignate the lands comprising 108-162 Vine Avenue from
18:23
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Standard Condominium for Phase 2, 11 units.
18:23
SIGNAL CONFIRMED
Site plan approval — Scarborough Health Network (SHN) is proposing for the development of a hospital parking garage located on an existing surface parking lot o
18:23
SIGNAL CONFIRMED
Site plan approval — Construct a 3-storey elementary school for 380 children and 4-room child care for 73 children, including all associated site amenities.
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — The re-designation of the Subject Lands will enable the proposed mixed-use development consisting of seven buildings ranging in height from
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application proposes the development of a 5-storey residential building. The building will provide a total of 62 residenti
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Amendment related to file 20 115847 NNY 08 SA proposes to consolidate many of the previously proposed bachelor and one-bedroom uni
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — The subject site has been developed as a single-storey commercial plaza comprised of four buildings with a total gross floor area of 4,877 s
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Removal of the holding symbol "(H)" applied by Zoning By-law 707-2024. The proposed development consists of a temporary sports facility comp
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Control application, specifically for Building A (Phase 1), with the temporary municipal address of 2 Dunelm Street. This Site P
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposal for a 650-square-metre addition to the existing single-storey building for a municipal shelter with approximately 80 beds.
18:23
SIGNAL CONFIRMED
Site plan approval — Two-tower mixed use building 36 and 39 storeys in height with a four-storey base building and a seven-storey podium connecting the two tower
18:23
SIGNAL CONFIRMED
Plan of condominium — Application for Draft Plan of Standard Condomimium to create 68 commercial units within the retail plaza building development and to permit
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval for a three-storey athletic training facility proposed by the Tempo Basketball Club Inc. (the "Toronto Tempo"). This prop
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — The requested Official Plan Amendment seeks to redesignate the subject site from General Employment Areas to Mixed Use Areas. The proposal i
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application proposes a 1-storey industrial building containing 7 units. A paved access from Industrial Street will be prov
18:23
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium Approval Application for 1007 The Queensway, 341 units.
18:23
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium Approval Application for 1037 The Queensway, 203 units.
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed 8-storey 54-unit supportive housing project. The submission proposes a total GFA of 2,707 sm, including 137 sm (1,483 sf) of indoor
18:23
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application proposes the development of an 48-storey residential building. The building will provide a total of 505 reside
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — OPA & Rezoning Application proposes the development of an 48-storey residential building. The building will provide a total of 505 residenti
18:23
SIGNAL CONFIRMED
Site plan approval — Proposed 19-storey mixed-use building comprised of 137 dwelling units (including 12 rental replacement units) and 300 square metres of groun
18:23
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed Official Plan Amendment and Zoning By-law Amendment applications contemplate the redevelopment of the Subject Site with two towers
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Official Plan & Zoning By-law Amendment to not replace the required office space and instead permit a minimum 1,815 m2 of non-residential sp
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park R
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval for a two-storey north side addition to a private school (Leo Baeck Day School).
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposed OPA Application for the removal of Street A.
18:22
SIGNAL CONFIRMED
Plan of condominium — Draft Plan of Condominium. The proposed development contains two 3-storey warehouse units. Building A contains 29 Industrial units and 186
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Zoning By-law Amendment to permit a self-storage warehouse use on floors 2-5 (formely The Bay retail space). The existing ground floor reta
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Zoning By-law Application to permit a temporary portable ready-mix concrete batching plant and offfice trailor for a period of up to three y
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan Approval for a 36-storey mixed-use residential building, which includes the partial retention of the existing heritage building at
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Official Plan Amendment and Zoning By-law Amendment Application proposes the development of a 35-storey mixed-use building. The building wil
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Combined Official Plan & Zoning By-law Amendment application for two residential tall buildings (41-storey and 39-storey respectively) with
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan application for a four-storey municipal shelter containing 51 beds.
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Proposal to amend the Zoning By-law to allow for a new 4-storey municipal shelter with approximately 50 beds.
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Redevelopment of 299 Roehampton Avenue with a new purpose-built rental apartment building with a shared 10-storey (33.3 metres) podium eleme
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Official Plan and Zoning By-law Amendment to develop a 10 and 7 storey mixed use building with 141 affordable rental units, including 54 ren
18:22
SIGNAL CONFIRMED
Site plan approval — Proposal to construct three additions to expand the existing food processing warehouse.
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Official Plan and Zoning By-law Amendment to permit a 13-storey (41.5 metre) mixed-use building containing 200 residential units with a tota
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application proposes the development of a 6-storey residential building. The building will provide a total of 86 units, be
18:22
SIGNAL CONFIRMED
Site plan approval — The proposed redevelopment of this site includes a new hotel and performance venue that will attract local, national, and international visi
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application - Administrative (18 163569 WET 12 SA)
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application proposes the development of an 38-storey mixed-use building providing rental residential and retail use at gra
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Zoning By-law Amendment to amend the Section 37 Agreement of By-law 1096-2021 to reduce the size of the child-care centre previously approve
18:22
SIGNAL CONFIRMED
Rezoning / Official Plan amendment — Zoning By-law Amendment application to lift the hold ('H') to By-law 672-2024.
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application for six blocks of four-storey townhouses. The blocks will consist a total of 50 three-bedroom townhouses. A pa
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan for a 40-storey mixed use purpose built rental building with 494 dwelling units, of which 30% will be affordable rental units. A t
18:22
SIGNAL CONFIRMED
Site plan approval — Site Plan Control Application proposes the development of a 42-storey residential building. The building will provide a total of 477 rental
18:22
BID RESULTS
ROMAG Contracting Ltd. low at $7,050,000
Industra Construction Corp., ROMAG Contracting Ltd.
17:58
TENDER NEW
APN - NORAD Northern Basing Infrastructure (NNBI), NWT
Defence Construction Canada - National Capital Region · closes 2026-09-30
16:50
TENDER NEW
Housing Construction Program MDB CFHA RPCIP Yellowknife
Defence Construction Canada / Construction de Défense Canada · closes 2026-09-17
16:50
TENDER NEW
APN - Housing Construction Plan
Defence Construction Canada - National Capital Region · closes 2026-10-15
16:50
TENDER NEW
APN - RP OPS and CFHA Base Program - NCR
Defence Construction Canada - National Capital Region · closes 2029-03-31
16:50
TENDER NEW
APN - NORAD Northern Basing Infrastructure (NNBI), Nunavut
Defence Construction Canada - National Capital Region · closes 2026-08-31
16:50
TENDER NEW
APN - RP OPS and CFHA Base Program , Nunavut
Defence Construction Canada - National Capital Region · closes 2029-03-31
16:50
TENDER NEW
APN - RP OPS and CFHA Base Program, Northern Canada
Defence Construction Canada - National Capital Region · closes 2029-03-31
16:50
TENDER NEW
Housing Construction Program MDB CFHA RPCIP Gagetown, Greenwood & Halifax
Defence Construction Canada / Construction de Défense Canada · closes 2026-10-15
16:46
TENDER NEW
Housing Construction Program MDB CFHA RPCIP Bagotville, Montreal & Valcartier
Defence Construction Canada / Construction de Défense Canada · closes 2026-10-15
16:46
TENDER UPDATED
Housing Construction Program MDB CFHA RPCIP Yellowknife
Defence Construction Canada / Construction de Défense Canada · closes 2026-09-17
16:46
TENDER NEW
EQ754-270127 Building Demolition, 98 Manitoba Street, Bracebridge, Ontario
Department of Public Works and Government Services (PSPC) · closes 2026-08-25
16:46
TENDER UPDATED
APN - Housing Construction Plan
Defence Construction Canada - National Capital Region · closes 2026-10-15
16:46
TENDER NEW
Refurbishment of the CTA Curtain Wall
National Research Council of Canada (NRC) · closes 2026-08-20
16:46
TENDER NEW
HVAC Removal and Replacement – 2 x Furnaces and 2 x Air Conditioning Units
Correctional Service of Canada (CSC) · closes 2026-08-20
16:46
TENDER NEW
CM-Major Renovation of Connaught Barracks and Other Construction Work
Defence Construction Canada / Construction de Défense Canada · closes 2026-08-25
16:46
TENDER NEW
EQ754-270159 - CSC Millhaven Door Control System Upgrades
Department of Public Works and Government Services (PSPC) · closes 2026-09-03
16:46
TENDER NEW
International Construction Works 5 international regions (Africa/Sub Saharan, Asia/Pacific, Europe, Middle East/Maghreb, and the Americas)
Department of Foreign Affairs, Trade and Development (GAC) · closes 2026-09-04
16:46
TENDER NEW
Basic Military Qualifications Facilities at CFB Borden
Defence Construction Canada / Construction de Défense Canada · closes 2026-09-21
16:46
TENDER NEW
Reconnection of Watermain Beaver Creek Institution
Correctional Service of Canada (CSC) · closes 2026-08-20
16:46
TENDER NEW
Roof Replacements – BC18 and BC24 – Beaver Creek Institution - Minimum
Correctional Service of Canada (CSC) · closes 2026-08-20
16:46
TENDER NEW
Boiler Replacement Project at the Harrow Research and Development Centre
Department of Agriculture and Agri-Food (AAFC) · closes 2026-08-24
16:46
TENDER NEW
MDB - Camp Sustain Theatre Support Coordination Centre (CS TSCC)
Defence Construction Canada / Construction de Défense Canada · closes 2026-09-14
16:46
TENDER NEW
M209 Dorm Recap, Borden, Ontario
Defence Construction Canada - Ontario Region · closes 2026-09-01
16:46
TENDER NEW
Retender EQ754-251469 Burlington Lift Bridge Security Gate and Fence Installation
Department of Public Works and Government Services (PSPC) · closes 2026-08-25
16:46
TENDER NEW
Indigenous Cultural Centre at Bath Institution
Department of Public Works and Government Services (PSPC) · closes 2026-08-27
16:46
TENDER NEW
MDB - Halifax Heating & Municipal Services Upgrade
Defence Construction Canada / Construction de Défense Canada · closes 2026-08-27
16:46
TENDER NEW
Step 2 for 2 Service Battalion HQ Administration Company Building
Defence Construction Canada / Construction de Défense Canada · closes 2026-09-10
16:46
TENDER UPDATED
APN - RP OPS and CFHA Base Program, Northern Canada
Defence Construction Canada - National Capital Region · closes 2029-03-31
16:46
TENDER UPDATED
APN - RP OPS and CFHA Base Program - NCR
Defence Construction Canada - National Capital Region · closes 2029-03-31
16:46
TENDER UPDATED
APN - NORAD Northern Basing Infrastructure (NNBI), NWT
Defence Construction Canada - National Capital Region · closes 2026-09-30
16:46
TENDER UPDATED
APN - RP OPS and CFHA Base Program , Nunavut
Defence Construction Canada - National Capital Region · closes 2029-03-31
16:46
TENDER UPDATED
APN - NORAD Northern Basing Infrastructure (NNBI), Nunavut
Defence Construction Canada - National Capital Region · closes 2026-08-31
16:46
TENDER NEW
South Campus Watermain Replacement
National Research Council of Canada (NRC) · closes 2026-08-25
16:46
TENDER NEW
Provision of Cable Installation Services for Canada’s Diplomatic and Consular Missions
Department of Foreign Affairs, Trade and Development (GAC) · closes 2027-07-30
16:46
TENDER NEW
Stage 1 - Keltic Peninsula Mill & pave project – Cape Breton Highlands National Park
Parks Canada Agency (PC) · closes 2026-08-20
16:46
TENDER NEW
APN_Accommodations Buildings, Modified Design Build (MDB), CFB Trenton
Defence Construction Canada - Ontario Region · closes 2026-09-05
16:46
TENDER NEW
APN_FIRE HYDRANT INSPECTION, TESTING AND MAINTENANCE (ITM) GARRISON PETAWAWA
Defence Construction Canada - Ontario Region · closes 2026-09-09
16:46
TENDER NEW
APN_CONSTRUCT NEW MAINTENANCE BUILDINGS (MDB PROJECT) PETAWAWA, ON
Defence Construction Canada - Ontario Region · closes 2026-09-07
16:46
TENDER NEW
General Construction QRT Source List
Defence Construction Canada - Ontario Region · closes 2029-07-20
16:46
TENDER NEW
APN - New Swing Space Buildings (MDB Project), CFB Kingston, ON
Defence Construction Canada - Ontario Region · closes 2026-08-23
16:46
TENDER NEW
APN - SUPPLY AND INSTALL ELECTRONIC SECURITY SYSTEMS
Defence Construction Canada / Construction de Défense Canada · closes 2026-11-04
16:46