Mechanical(MS) — revision 01
71 FRONT ST W, TorontoPermit details
- Application
- 25 148021 MSA rev 01
- Address
- 71 FRONT ST W, Toronto (M5J)
full property record — every permit and signal at this address
- Work
- Other(MS)
- Structure
- Transit Station,Subway, Bus Terminal
- Status
- Revision Issued
- Applied
- 2025-08-07
- Issued
- 2025-10-22
- Declared value
- —
- Current use
- Transit Station
- Proposed use
- Transit Station
- Builder
- Owner-filed
Scope of work (as filed)
REV 01 - Revision to permit to account for added 100 mm dia. excess steam pumped condensate pipe routing and connection to existing City of Toronto 350mm dia. sanitary inside the MOAT. Updated routing for the DCW piping and fire standpipe to go through Bicycle Storage Room wall, down into void space and then through the 1929 wall into the GO Boiler Room and service corridor ceiling at the existing Union Station concourse level, respectively. Relocated the DCW meter and assembly in GO Boiler Room.Mechanical, electrical, and IT services implemented north of USEP project limit (10 ft North of 1929 wall) for running the conduit/pipes, to occur concurrently with USEP construction to accelerate overall project completion. (Related to Main Building Permit 22 237137 BLD 00 NB).
Same application (2)
| Permit | Applied | Status |
|---|---|---|
| Mechanical(MS) rev 00 Other(MS) |
2025-04-23 | Permit Issued |
| Fire/Security Upgrade rev 00 Building Permit Related(FS) |
2025-05-22 | Application On Hold |
Revisions and plumbing/mechanical/drain permits filed under the same application number.
Is this project worth chasing?
Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.
Analyze this project →Planning something similar?
If you're an owner or tenant planning comparable work, we'll tell you what it should cost — read from records like this one — and introduce insured contractors with a track record on it.